PORTFOLIO

The purpose of coordination is to save time and money by building in digital space before building in the real world. There should not be any major surprises in modern building. A CONSTRUCTABLE model, not a CLASH FREE model is the result. Utilities need to do more than miss each other. The trades need to be able to actually install an element in the location determined by coordination. Facilities personal need to have suitable access.  It is essential that the voice of Owners, Facilities Managers, Superintendants, trade professionals and MEP Coordinators are taken into consideration.

ECBHS

Behavioural health center built to adjacent active hospital facility
.

VIEW PROJECT

RIC Palo Alto

Research and Innovation center for confidential client in Palo Alto

VIEW PROJECT

5110 Telegraph

Modular construction project

VIEW PROJECT

Kaiser South San Francisco Generator Replacement

Replacement of emergency back up generator in active hospital

VIEW PROJECT

Design Tech High School at Oracle

Award winning design & technical educational facility on Oracle campus

VIEW PROJECT

Kaiser Scott’s valley MOB

Tenant improvement to convert spaces in an active office building to build medical offices and exam rooms

VIEW PROJECT

METROLOGY

Metrology is not just for aerospace and shipbuilding anymore…

As Construction and building technology progresses, prefabrication and manufacturing are becomming common practices.  This necessitates a higher level of precision above and beyond traditional survey practices.  IT is essential the construction industry adopts Metrology fo placing critical items.

GO TO METROLOGY

Bluebeam Extreme Conference 2016

Tracking Relocation of 2,600 Microprocessing tools using Bluebeam and iPads

Alex Tanguay Describes how he used Bluebeam, an iPad and the mark up columns feature of Bluebeam to track relocation and re installation of 2600 micro processing tools. No cut sheets or equipment information were given by the client. Instead, iPads were used to conduct a field investigation to document equipment utility & anchorage locations for installation at the new facility.

RESOURCES

Nobody climbs BIM Mountain alone.  Here are some things I have picked up along the way that might help you out. 

BLOG

From the grittiest parts of the field to the depths of cyberspace.  Dispatches from my journey through Construction and Metrology.

Learn more